Great Hall at City College of New York
The $12.8 million restoration of the 14,000 sf Great Hall was made necessary by deteriorated structural elements, a severely inadequate mechanical system and crumbling floors. The scope of work allowed the introduction of modern, state of the art acoustic and lighting systems which make the grand assembly space available for a wide variety of programs ranging from lectures and musical performances to commercial film and television shoots. The work also included the refurbishment of twelve sixty-foot stained glass windows, extensive repair of the elaborate decorative plaster and woodwork, and newly designed limestone floor and new control booth. The restoration received the Lucy G. Moses Award from the New York Landmarks Conservancy.
Project Data
Client: The Dormitory Authority of the State of New York + City University of New York
Project Size: 14,000 square feet
Construction Cost: $12,800,000
Services: Full Architectural Services
Completed: 1997